Baku/19.02.18/Turan: At this stage, no changes can be made in the Trans Adriatic Pipeline (TAP) project, which envisages transportation of Azerbaijani gas to Europe, European Commission Vice-President for Energy Union Maros Sefcovic told Italian media.He was commenting on the possibility for changing TAP"s landing point in Italy"s Melendugno.The construction is at an advanced stage, so no changes are possible, said Sefcovic.The landing point in M...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus