Baku/24.05.23/Turan: "ACWA Power" (Saudi Arabia) will put into operation a 240 MW Khyzy-Absheron wind power plant in Azerbaijan in 2025, the press release of the Ministry of Energy of Azerbaijan says following the visit of Energy Minister Parviz Shahbazov to Saudi Arabia.On May 24, the Minister met with the Chairman of the Board of "ACWA Power" Mohammed Abunayan."During the meeting, the parties discussed the state of affairs on the construction o...

Please login or subscribe to read more

Leave a review

Economics

Follow us on social networks

In Focus