Baku/15.11.22/Turan: The timing of the first gas production from the "Absheron" Caspian field (developed by "TotalEnergies" and "SOCAR" on a parity basis) has been shifted.An informed source told Turan that the first gas from this field will be produced in the second quarter of 2023, while previously it was expected in the first quarter.The source said that this field will produce about 1 billion cubic meters of gas next year, and the entire volu...

Please login or subscribe to read more

Leave a review

Economics

Follow us on social networks

In Focus