The Government of Azerbaijan plans to implement projects for the construction of four power plants in the field of renewable energy sources (RES) on the Absheron Peninsula by 2040. Such plans are reflected in the General Plan of the city of Baku until 2040. According to the General Plan, it is planned to build one wind turbine (WPP) and three solar power plants (SPP) with an installed capacity of 1200 MW in the villages of Alat, Lokbatan, Sabu...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus