SOCAR builds an oil tanker in Baku for $29 million
SOCAR builds an oil tanker in Baku for $29 million
Baku Shipbuilding Plant LLC will produce a tanker for oil transportation by order of SOCAR (the State Oil Company of Azerbaijan.) According to SOCAR's published financial statements for the first half of 2023, the State Oil Company and Baku Shipbuilding Plant LLC signed a contract for the construction of a tanker on April 12 this year. SOCAR transferred $28.8 million to the account of the shipyard for the implementation of the project.
At the same time, the reporting does not specify the characteristics of the tanker, as well as the timing of completion of its construction. --0--
-
- Energy
- 6 December 2023 07:57
Energy
-
In 2023, Azerbaijan produced 4 million 369.8 thousand tons of fuel (automotive gasoline, diesel fuel, and aviation kerosene), whereas last year the total volume amounted to only 3 million 906.9 thousand tons. Over the past year, fuel production in the country decreased by 462.9 thousand tons, or by 10.6%.
-
According to preliminary data, in the past year, Azerbaijan's gross domestic product (GDP) amounted to 126.3 billion manats (approximately $74.3 billion at the current exchange rate), a 4.1% increase compared to 2023, the monthly report by the State Statistical Committee of the Republic of Azerbaijan.
-
In 2024, the total volume of oil and condensate production in Azerbaijan amounted to 29 million 63 thousand tons, the monthly report by the State Statistical Committee of the Republic of Azerbaijan.
-
The Trans Adriatic Pipeline (TAP AG) consortium has developed a roadmap for preparing to transport hydrogen, according to TAP AG. “TAP’s goal is to develop infrastructure for hydrogen transportation. We have defined a roadmap for preparing for the medium- and long-term transportation of natural gas and hydrogen blends, as well as renewable gases. A preliminary study in 2021 confirmed the potential of TAP for transporting hydrogen mixtures in the future. Currently, we are conducting pipeline material tests at an international laboratory. The results of the first tests were received in the fourth quarter of 2024 and are now under evaluation. The next round of tests has already begun, and results are expected in 2025,” said the consortium.
Trampın gəlişi dünyaya, regiona nə vəd edir? – Zərdüşt Əlizadə Çətin sualda
News Line
-
- Social,
- 15:22
- 295
-
- Markets Review,
- 14:22
- 244
-
- Politics,
- 11:24
- 483
Leave a review