In July, the prices of construction materials increased by 2%.

In July, the prices of construction materials increased by 2%.

In July, prices for construction materials in Baku rose by an average of 2%.

The following items became more expensive: Guzdek cobblestone (+46%), Karadag cobblestone (+26%), brick (+18%), refractory brick (+11%), construction sand (+9%), ordinary glass (+7%), iron roofing (+4%), and others.

Prices for other construction materials increased by 3-5% or remained unchanged.

Comparative prices of some construction materials over the last month:

Table 1. Retail price of construction rebar $/t

Profile

7.08.2024

7.07.2024

Difference

Produced

8

1250

1300

-50.0 %

Local

10

-

-

   

12

-32

-

   

14

-40

-

   

Table 2. Prices of local stone-based masonry materials, AZN/piece

Name

7.08.2024

7.07.2024

Difference

Karadag stone

0.95

0.75

+0.20 % 26

Guzdek stone

0.90

0.65

+0.30 % 46

Refractory brick

2.50

2.25

+0.25 % 11

Ordinary brick

0.65

0.55

+0.10 % 18

Table 3. Prices of roofing materials in AZN

Roofing Materials

Size

7.08.2024

7.07.2024

Difference

Produced

Asbestos slate

6 wave

11.0

11.0

0

Russia

Iron

17 wave

13.0

12.50

+0.50 % 4

Ukraine

 

2 wave flat

18.0

17.0

+1.0 % 6

Ukraine

Modern roofing

1 wave glossy

10.0

10.0

0

Finland

 

1 wave non-glossy

13.0

12.50

+0.50 % 4

Finland

Table 4. Glass prices in AZN/sq.m

Glass Type

Thickness mm

7.08.2024

7.07.2024

Difference

Produced

Ordinary glass

4

15.0

14.0

+1.0 % 7

Iran

 

6

12.0

12.0

0

 
 

8

22.0

22.0

0

 
 

10

24.0

24.0

0

 

Frosted white glass

4

16.0

16.0

0

 

Frosted chestnut

4

16.0

16.0

0

 

Mirror glass

4

27.0

26.0

+1.0 % 4

 

Table 5. Nail prices in AZN/kg

Purpose

Size

7.08.2024

7.07.2024

Difference

Produced

For slate

120

5.0

5.0

0

 

For iron

100

5.0

5.0

0

 

For concrete

Ordinary

5.0

5.0

0

 

Ordinary nail

60-80

3.0

3.0

0

 
 

150

3.0

3.0

0

 

Table 6. Timber prices in AZN/1 cu. m

Name

Size

7.08.2024

7.07.2024

Difference

Produced

Pine timber

3-10

340

350

-10.0 % 3

Russia

Table 7. Russia's wood-based panels in AZN

Thickness

Area sq.m

7.08.2024

7.07.2024

Difference

Plywood

6

25.0

26.0

+1.0 % 5

 

8

24.0

24.0

0

 

10

31.0

31.0

0

 

12

34.0

34.0

0

 

15

42.0

42.0

0

 

18

50.0

50.0

0

AQL(DSP) smooth

16

40.0

40.0

0

AQL (DSP) ordinary

16

38.0

38.0

0

ALL(DVP)

4

23.0

22.0

+1.0 % 5

Table 8. Construction cement prices in kg/AZN

Brand

Weight

7.08.2024

7.07.2024

Difference

Produced

Optimal

40

8.50

8.0

+0.50 % 6

Qaradaghcement

Special

40

8.50

8.0

+0.50 % 6

 

Ordinary

40

8.0

7.20

+0.80 % 11

Russia

M400

40

8.60

8.0

+0.60 % 7

 

Table 9. Construction sand prices in AZN

Type

Weight

7.08.2024

7.07.2024

Difference

Baku (Shikhlar)

12

600

550

+50.0 % 9

Shurabad

12 ton

570

540

+30.0 % 5

Mingachevir

12

590

540

+50.0 % 10

Gravel

12 ton

500

450

+50.0 % 12

Table 10. Paint prices

Type

Size/kg

7.08.2024

7.07.2024

Difference

Produced

Interior emulsion

25

59.0

57.0

+2.0 % 3

Turkey

Facade emulsion

25

65.0

65.0

0

 

Glossy paint

20

65.0

65.0

0

 

Non-glossy paint

25

52.0

52.0

0

 

Table 11. Prices of Drywall in AZN

Type

Size

7.08.2024

7.07.2024

Difference

Produced

For ceiling

120/250

12.0

11.50

+0.50 % 4

Turkey

For partitions

120/250

14.0

13.50

+0.50 % 3

-

Table 12. Prices of Local Plastic Pipes per Meter in AZN

Profile

7.08.2024

7.07.2024

Difference

20

1.25

1.20

+0.05 % 5

25

1.95

1.90

+0.05 % 3

32

2.35

2.35

0

40

5.10

5.0

+0.10 % 2

50

5.50

5.50

0

100x1

5.0

5.0

0

100x2

6.0

6.0

0

100x3

9.0

9.0

0

Total

 

7.08.2024

7.07.2024

Difference

 

4718.05

4582.45

+135.60 % 2

 

Leave a review

Markets Review

Follow us on social networks

News Line