
Baku/04.10.17/Turan: On Wednesday morning, as a result of torrential rains, part of the highway in Nizami district of the capital on the avenue Gara Garaev was damaged. A large pit, about 6 meters in diameter, was formed above the sewer. The traffic was closed. Repair work began.
It is noteworthy that in June-September OJSC "Azeravtoyol" carried out repair works on this prospect in accordance with the order of the president of the country. "Azeravtoyol", the mayoralty of the capital, the Ministry of Emergency Situations and no other state structure gave any explanation on this matter. -06B-
Leave a review