Baku/17.05.21/Turan: On May 15, scheduled preventive maintenance (SPM) started at the Armenian NPP as part of a project to modernize and extend the life of the plant. The Armenian nuclear power plant will shut down for 141 days - this is the longest maintenance period since the start of the plant's operation. Such a long stop is connected with the final important work on the modernization of the second power unit of the Armenian NPP,” the press s...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus