Baku/13.01.21/Turan: Azerenerji OJSC has started overhaul and restoration work at the Sugovushan-1 and Sugovushan-2 small HPPs with a total capacity of 7.8 megawatts, which are located in the territories liberated from occupation.As reported by the press service of the OJSC, in Sugovushan the Armenian occupants dismantled workable spare parts of small power plants with a capacity of 4.8 and 3 megawatts, and what they could not carry was destroyed...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus