Baku/29.07.22//Turan: BP announced the successful installation of drilling modules on the deck of the topsides of the production platform being built as part of the “Central East Azeri”  (CEA) project.“Two drilling modules are safely and efficiently placed on the CEA platform topsides block under construction. Each of the two drilling modules includes a drilling support module weighing 2350 tons, 43 meters long, 20 meters wide and 20 meters high,...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus