Baku/23.04.21//Turan: Since April 22, 2021, BP has stopped the West Azeri oil platform for maintenance work on the Azeri-Chirag-Guneshli (ACG) block of fields.As part of the work program, various projects will be implemented on the platform, including replacement of flare tips, modernization of the ignition system and important repairs.Carrying out these works is aimed at ensuring the operation of the platform in a safe, reliable way and without...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus