Baku/23.08.19/Turan: In the 3rd quarter of 2020, BP-Azerbaijan plans to complete the first stage of drilling the first exploratory well at the prospective Shafag-Asiman structure in the Azerbaijani sector of the Caspian. "The depth of the sea in the area of ​​well drilling"SAX01"is 624 meters. Drilling is planned to begin in the 4th quarter of 2019 using the Heydar Aliyev semi-submersible floating drilling rig. Drilling operations, including well...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus