Baku/28.10.20/ Turan: The deadline for completing the connecting gas pipeline from Bulgaria to Hungary, which is a continuation of the Turkish Stream in Serbia, has been named.It can be completed by the end of 2020, said the Russian Ambassador to Serbia, Alexander Botan-Kharchenko, according to the local agency Tanjug.According to him, gas metering and compressor stations are currently incomplete. He added that in the field of energy, the gas pip...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus