Baku/24.12.21//Turan: The Satti jack-up drilling rig has been transferred to the promising area of ​​Bibi-Heybat (Baku Bay) for drilling a second exploration well, reported  BP-Azerbaijan, the operator of the shallow water part of the Absheron Peninsula (SWAP).It is reported that the first exploration well in the North Khali field was drilled in accordance with the original design and plan.Drilling of the second well began on December 11 and is s...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus