Baku/03.06.22//Turan: Azerbaijani Energy Minister Parviz Shahbazov said that the Greece-Bulgaria Interconnector (IGB), through which Bulgaria will be able to receive Azerbaijani gas, will be ready for commercial operation in early September 2022.“We assessed the current situation around IGB with Bulgarian Energy Minister Alexander Nikolov. IGB is expected to be ready for commercial operation in early September,” Shahbazov tweeted.It should be not...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus