Baku/19.09.22//Turan: The timing of the full resumption of oil production at Kashagan will be known at the end of September, Kazakh Energy Minister Bolat Akchulakov said."September 20-21 is the deadline for reconciliation. In general, in theory, it will probably already be October," Akchulakov told Interfax-Kazakhstan, commenting on the planned timing of the full resumption of oil production at Kashagan after repair work. On  August 3, it was rep...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus