Baku/11.12.17/ Turan: Lukoil began drilling the first production well at the second stage of the Vladimir Filanovsky deposit in the Caspian Sea.As stated in the company's press release, drilling is scheduled for completion in early 2018.At the moment, within the first stage of field development, six production wells and two injection wells are in operation. Accumulated oil production exceeded 5 million tons.The second stage of the development wil...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus