Baku/01.02.21//Turan: A main gas pipeline should be built in the liberated territories. So far, design and search work is underway. Ruslan Aliyev, Director General of Azerigaz Production Association, told reporters.According to him, the start date of work is still unknown. “Initially, it is planned to build a main along the Araz River, from which gas will be distributed throughout the regions of Karabakh. This is an initial project and it can be...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus