Current repair work has been carried out at the 154/110/35-kilovolt "Arpachay" substation in Nakhchivan,  the State Energy Service of the Nakhchivan Autonomous Republic reported. According to the information, a new voltage transformer has been installed at the substation. It was also noted that a new 35-kilovolt voltage transformer was installed for accurate electricity metering at the substation.

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus