Baku/07.08.23//Turan: In the first half of 2023, oil production from the Azeri-Chirag-Guneshli block (ACG) was conducted from 137 production wells, the quarterly report of BP-Azerbaijan (operator for the development of ACG). "In January-June 2023, three oil producing and four water injection wells were drilled at the contract block. By the end of June 2023, 137 oil-producing, 44 water and 7 gas injection wells were in operation," the company note...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus