Baku/10.02.20/ Turan: Oil production from the Azeri-Chirag-Gunashli (ACG) block in 2019 was carried out from 125 production wells.According to BP-Azerbaijan (project operator), in 2019, 10 oil production wells and one water injection well were drilled at the contract block. As of the end of December 2019, there were 125 oil producing, 46 water injection and 7 gas injection wells in operation.As reported, oil production from the offshore ACG block...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus