Baku/25.04.18/ Turan: Pipes have been welded on 87% of the route in Greece and Albania. This is stated on the Twitter page of the Trans-Adriatic Pipeline (TAP) Consortium."Construction work continues in the Albanian mountains. The highest section of the TAP (about 1,800 meters above the sea level) is in the country's Skrapari district. Pipes have already been welded on 87% of the pipeline route in Greece and Albania (about 670 of the 765 kilomete...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus