Baku/01.11.19/ Turan: BP-Azerbaijan (the operator of the development of the block of Azeri-Chirag-Guneshli fields) resumed oil production from the West Chirag platform after preventive work.According to BP, the work of the West Chirag platform was resumed from the evening of October 29, and currently production from the platform is being brought to the previous level.During the platform shutdown, preventive maintenance was carried out on it. In p...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus