Baku/14.07.17/ Turan: SOCAR-AQS LLC started drilling a new well in the shallow part of the Gunashli field.As the LLC reports, the design depth of well # 323 is 2,770 meters. The drilling will be carried out to the productive layer of Balakhani X. The customer of the drilling is PA Azneft.The development of the shallow part of the Gunashli field has been under way since 1980. The field provides up to 65% of the entire oil production of SOCAR.SOCAR...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus