Baku/12.08.20/ Turan: On August 10, President of Azerbaijan Ilham Əliyev took part in the ceremony of sending the support block of the production platform to the sea to be installed at the Qarabağ field, the website of the head of state reports.“The support block was built at the Baku deep-water foundation plant named after. H. Əliyev. The block was built by BOS Shelf (subsidiary of the State Oil Company of Azerbaijan),” the message says.SOCAR an...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus