Baku/22.07.19/ Turan: At the end of June, the construction of the Trans-Adriatic Pipeline (TAP), designed to ensure the supply of Azerbaijani gas to Europe, has been completed by 88.5%. This is reported by the TAP consortium.It is reported that work is proceeding on schedule.It should be noted that the TAP pipeline, which is part of the Southern Gas Corridor project, is initially planned to supply 10 billion cubic meters of gas produced in the fr...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus