Baku/14.10.19/ Turan: More than 99% of the pipes under the Trans-Adriatic Gas Pipeline (TAP) project were laid in the ground. This was reported by a representative of the TAP AG consortium."In 2016, transportation of steel pipes was in full swing. Three years later, more than 99% of the pipes have already been laid in the land in Greece, Albania and Italy," said the representative of the pipeline consortium.The length of the pipeline is 878 kilom...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus