Baku/16.05.22//Turan: The Azerchimya Production Association (SOCAR's petrochemical structure) will resume the operation of the Ethylene-Polyethylene plant from May 16 after a planned shutdown for preventive and repair work.As director of the plant Ogtay Niftaliyev told reporters, the plant has stopped for scheduled repairs since April 4, simultaneously with the shutdown of the Baku Oil Refinery named after. H. Aliyev to carry out works on reconst...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus