Baku/08.02.19/ Turan: Drilling of the first production well ABD-001 at the Absheron field in the Azerbaijani sector of the Caspian Sea will end in the third quarter of 2019, SOCAR President Rovnag Abdullayev said."The Heydar Aliyev semi-submersible floating drilling rig began drilling the first well at the Absheron field in 2018. The design depth of this well will exceed 7,400 meters. The drilling operations will be completed in the third quarter...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus