Baku/30.11.22/Turan: "Daşkəsən Dəmir Filiz" (DDF) on 29 November has signed a contract for a detailed design of auxiliary buildings, infrastructure and slurry pipeline to be constructed and restored for reconstruction of a processing plant and related infrastructure to ensure production of iron ore concentrate in Dashkesan iron ore deposit.Like the previous one, the contract was awarded to ZAO "Encotec". The cost of this contract amounted to AZN...

Please login or subscribe to read more

Leave a review

Economics

Follow us on social networks

In Focus