Baku / 15.12.17 / Turan: Reconstruction of a non-working airport in the Zagatala region is surprising, as no flights have been carried out from this airport, the economist Natig Jafarli said in an interview with Turan.We would like to remind that AZAL spread the message about the reconstruction carried out at this airport, the need for which arose after the earthquake in the area in 2012.For the first time Zagatala Airport was reconstructed in 20...

Please login or subscribe to read more

Leave a review

Economics

Follow us on social networks

In Focus