Baku/09.08.21//Turan: In the first half of this year, oil production and three water injection wells were drilled at the Azeri-Chirag-Guneshli (ACG) offshore fields, the quarterly report of BP-Azerbaijan.During the same period last year, eight production wells were drilled at ACG. In addition, in the first six months of this year, ACG supplied an average of 9.1 million cubic meters of associated gas per day through the Sangachal terminal and thro...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus