Baku/16.12.19/ Turan: Azerenerji OJSC commissioned a small hydroelectric power station in Baku on the territory of Shimal-2 State District Power Station (North), the company said.“Until now, the water from the Caspian used to cool the condenser of the steam turbine of the Shimal-2 state district power station was poured back into the sea. Now, the used water goes to a new small hydroelectric power station, where electricity is generated from its...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus