Baku/08.07.19/ Turan: The Caspian Pipeline Consortium (CPC) will spend $ 600 million on the capacity modernization program, calculated from 2019 to 2024, CPC General Director Nikolai Gorban told reporters.Specifying the timing of the program, the General Director noted that the provision of the possibility of receiving additional volumes of crude oil in the oil pipeline system CPC from the territory of Kazakhstan is expected from mid-2022, and th...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus