Baku/05.07.17/Turan: Following the successful sail-away of Azerbaijan"s Shah Deniz 2 Quarters and Utilities (QU) platform topsides on the STB-1 transportation barge, the topsides unit arrived in its location at around 18:00 on July 2, said the message from BP.On July 3, the float-over operations started with the STB-1 moving slowly into the jacket slot. The float-over operation was completed with full load transfer onto the jacket at 15:00.On Jul...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus