Baku/08.12.17/ Turan: It is planned to start natural gas production at the 14th phase of the Iranian gas field South Pars early next year, the director of the 14th phase said, Shana news agency reported.Hamidreza Masoudi added that platform A of the 14th phase will be ready for loading and installation in the specified area in January 2018, after carrying out "successful operations" at the first offshore project well."The test results show that t...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus