Baku/08.05.23//Turan: In the first quarter of 2023, oil production from the Azeri-Chirag-Guneshli block (ACG) was conducted from 139 production wells. Two oil production and two water injection wells were drilled at the contract block in January-March 2023, the quarterly report of BP (the operator for the development of the ACG field block). By the end of March 2023, 139 oil producing, 42 water and 8 gas injection wells were in operation. Accordi...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus