Baku/05.08.22//Turan: The Caspian Pipeline Consortium (CPC) has significantly reduced the volume of oil pumped through the Tengiz-Novorossiysk pipeline system due to repairs at the Tengiz field, the consortium said.“Also, due to the shutdown of oil production at the Kashagan field, the volumes of oil intake into the CPC pipeline system have been reduced. These factors  caused a significant decrease in the total volume of oil pumped through the Te...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus