Baku/27.06.18/ Turan: Gazprom resumed laying the second leg of the Turkish Stream. The Pioneering Spirit vessel returned to the Black Sea after a unique operation to install the Norwegian project Johan Sverdrup on the support platforms of the North Sea.Pioneering Spirit completed the preparatory work, including the launch of the stinger and the inspection of the pipe-laying equipment, and began to move towards the Turkish coast. At present, it is...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus