Baku/31.07.20/ Turan: The consortium for the construction of the Trans Adriatic Pipeline (TAP AG) completed welding work on July 29 as part of the construction of the TAP gas pipeline."The last weld on the TAP pipeline has been made. This means that the 878 km gas pipeline is connected from the Trans-Anatolian gas pipeline to the gas receiving point in Italy. Thus, another stage on the way to the opening of the Southern Gas Corridor has been comp...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus