Baku/03.05.17/ Turan: SOCAR has started construction of a new offshore platform No. 730 in the Darwin Bank field.According to the press service of SOCAR, the platform will be installed on 16 support blocks at a depth of 8-8.5 meters.The total area of ​​the platform will be 3,480 square meters. It will include the production and residential sectors connected by two pedestrian bridges.The platform is designed to drill 16 production wells. The expec...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus