Baku/21.02.18/ Turan: French Total plans to start production of the first gas from the Absheron field in the Azerbaijani sector of the Caspian Sea in early 2020."Production of the first gas from the Absheron field is planned to begin in early 2020. At the first stage, the deposit is planned to produce 4.3 mcm of gas and 12,000 barrels of condensate daily," the company's environmental and social impact assessment report (EIA) says.Total plans in M...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus