Baku/31.08.20/ Turan: President of Turkmenistan Gurbanguly Berdimuhamedov signed a Resolution, according to which the Turkmenbashi Oil Refinery Complex is allowed to conclude a contract with the Turkish company Çalık Enerji for the construction of two gas turbines at the Complex and the reconstruction of the power plant.According to the document, the objects must be commissioned within 18 months with full readiness for operation.The draft of this...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus