In 2014 SOCAR increased oil shipment from the Ceyhan terminal by 4%
In 2014 SOCAR shipped 20,438,248 tons of Azerbaijani oil from the Ceyhan oil terminal, up 3.7% against 2013.
According to SOCAR’s press office, in December 2014 the company shipped 2,194,300 tons of oil from the Ceyhan terminal.
The length of the Baku-Tbilisi-Ceyhan (BTC) oil pipeline is 1768 km, of which 443 ones lie in Azerbaijan, 249 km in Georgia and 1076 km in Turkey. The carrying capacity of the pipeline is 60 million tons of oil a year.
The project partners include BP (30.1%); SOCAR (25.00%); Chevron (8.90%); Statoil (8.71%); TPAO (6.53%); ENI (5.00%); Itochu (3.40%); ConocoPhillips (2.50%); INPEX (2.50%), Total (5.00%) and ONGC (2.36%).—0--
Economics
-
Rovshan Najaf, President of the State Oil Company of Azerbaijan (SOCAR), and Oleg Korobchenko, Deputy Prime Minister and Minister of Industry and Trade of the Republic of Tatarstan, discussed cooperation and expressed satisfaction with the partnership between SOCAR and the Russian oil company Tatneft.
-
Azerbaijan’s drive to attract investment into its industrial and agricultural zones is gaining momentum, with the government registering 31 new resident companies across economic zones in 2023. The Economic Zones Development Agency (EZDA) also granted non-resident status to one company, marking a new phase in the country’s efforts to stimulate economic growth in post-conflict areas and beyond.
-
The State Oil Company of Azerbaijan (SOCAR) is stepping up its international expansion in upstream operations, marking a strategic shift in its global portfolio. The company’s recent acquisitions— a 10% stake in Israel’s Tamar gas field and a 3% share in the SARB and Umm Lulu offshore oil projects in Abu Dhabi—signal its growing ambitions beyond Azerbaijan’s borders.
-
BP plans to drill 19 wells at the Azeri-Chirag-Guneshli (ACG) oilfield block in 2025, maintaining its drilling activity at the same level as in 2024, a senior company executive said on Tuesday.
Leave a review