Baku/03.06.20/ Turan: In the first week of April this year, a total of 100 million tons of oil was produced from the Chirag platform, where production began on November 7, 1997. Turan agency came to this conclusion by analyzing the data of the report "On the sustainable development of BP in Azerbaijan in 2019".According to the document, 500.9 million tons of oil was produced from the block of Azeri-Chirag-Gunashli (ACG) deposits for the entire pe...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus