Baku/13.12.17/ Turan: For January-November 2017, Azerigaz built new gas pipelines with a total length of 1,336.4 km, in order to operate the network in a safe and normal mode, while 204.4 km of gas pipelines have been repaired.According to the Production Association, these 52 settlements are located in the regions of Goranboy, Agjabedi, Barda, Sheki, Ujar, Guba, Gusar, Oguz, Imishli, Saatli, Sabirabad, Lerik, Agstafa, Khachmaz, Bilasuvar, Astara,...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus