Baku/22.07.22/Turan: The Baltic Pipe gas pipeline was connected to the gas transmission systems of Poland and Denmark, the Polish gas pipeline operator GAZ-System said. Before October 1, 2022, it is planned to complete the launch work and filling with gas, followed by the launch of fuel transportation.Immediately after the start of operation, the capacity of Baltic Pipe will be about two to three bcm of gas per year, and in 2023 it will reach a m...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus