Baku/07.05.21//Turan: BP-Azerbaijan has resumed oil production from the West Azeri platform of the Azeri-Chirag-Guneshli block of fields after maintenance work.“The planned 15-day maintenance program, which began on April 22, 2021 on the West Azeri platform, has been successfully completed. All inspection and design work envisaged by the program were completed on May 4 (according to the schedule, they were scheduled for May 6 - Turan), and produc...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus