Baku/20.10.17/ Turan: 373 km of the Turkish Stream gas pipeline has been laid on the sea section in total on two strings, Gazprom said. This is more than 41% of the total length of the sea section, which exceeds 900 km.Drilling and dragging of pipes in micro tunnels on the gas pipeline"s overland section have been also completed.The offshore section of the Turkish Stream will pass from the Russkaya CS in the Anapa area across the Black Sea bottom...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus