Baku/19.08.20/ Turan: The volume of oil pumped through the Baku-Tbilisi-Ceyhan (BTC) pipeline in January-July 2020 amounted to 16 million 745.3 thousa...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

News Line